• From sales to installation Teleflex guarantees quality. With own engineering, production, test facilities, programming and installing we keep our standards high....

  • Railtechniek uses state of the art 3D Cad Engineering, innovative production methods to optimize customer specifications.

16.03.2016

Top Centre Laundry in East Devonport (AUS)

Dunnewolt B.V. has been awarded again with a new major contract to supply and install a new D2 and D3 Dunnewolt monorail system at Top Centre Laundry in East Devonport (AUS). The order contains the delivery of 14 Dunnewolt stainless steel sorting bins with sorting belts, a new D2 system and a new D3 system and the complete installation of above.

 

Start assembly July 2016

http://www.topcentrelaundry.com.au/
26.08.2015

Knights Commercial Laundry in Toowoomba (AUS)

Dunnewolt B.V. awarded with a new major contract to supply and install a new D2 and D3 Dunnewolt monorail conveyor at Knights Commercial Laundry in Toowoomba (AUS).  The order also contains the delivery of 14 Dunnewolt stainless steel sorting bins, several loading and sorting belts and the complete installation of above components.

Start assembly December 2015.  

http://knightslaundry.com.au
27.05.2015

Aramark Inc. in Stockton (USA)

Dunnewolt B.V. delivered and installed an extension to the D2 – 820 monorail system at Aramark in Stockton (USA). The purchase order from Senso Technics B.V. contained also 2 pieces new and redesigned original Dunnewolt stainless steel sorting bins respectively with 12 and 16 positions. Also 100 new bag containers, several pneumatic and electric hoists, switches and switch sections, bends etc. were installed. Also a general overhaul was performed at the existing Dunnewolt conveyor.      ... ...